Quotation Request

Self-Build Zone Eire Site Insurance - Direct

Project Details
Site & Construction Information
Structure 1
Structure 2
Structure 3
Structure 4
Structure 5
Legal Expenses and Contracts
Client Details
Project Finance
Optional Covers
Declaration
Hidden Information
Calculation Page

Project Details

Site address:
Eircode
When would you like the policy to start?
When do you expect the property will be ready to be lived in?
Please ensure the date you enter is not set before the start date of the policy.
If Other, please provide details:
Do you expect work to start within 90 days?
To your knowledge, have there been any incidents on site which have or could have given rise to a claim under the type of insurance you are applying for here?
If yes, please provide details:
Has there been Site Insurance on this project previously?
Please provide details of the insurer and policy number, if known.
If Other, please provide details:

Site & Construction Information

The following assumptions have been made regarding the site:

  1. The site is not subject to any of the following ground conditions:

    •Flood area
    •Subsidence/landslide
    •Mining
    •Peat
    •Sink holes
    •Pyrites

  2. You will not need to carry out any ground stabilisation techniques on your site before you start construction (ie the ground does not require treatment such as vibro compaction or subsoil injection before it is suitable to build on).
  3. There be no piling or excavations over 3 metres in depth.
  4. You will not be carrying out any works which may affect any land or property not belonging to you.
  5. There are no trees on site which are protected by legislation.
Please confirm that you agree to the above statements.
If you disagree with any of the above, please provide full details including dates, damage, surveyor’s recommendations and any remedial action taken
Will your project involve any demolition works?
Will you be building any retaining walls forming a direct part of the structure or on the boundary line?

Structure 1

Name or description of structure (eg ‘main house’, ‘barn A’, ‘boundary wall’ etc):
Professional reinstatement cost of new works only:
Total external floor area (including upper floors, basements & habitable roof space):
metres
New or existing structure?
Professional reinstatement cost of the retained structure (not including new works):
If Other, please provide details:
If Other, please provide details:
If Other, please provide details:

The following assumptions have been made regarding this structure:

  1. You will not need to carry out any form of underpinning, foundation reinforcement or stabilisation work to the structure.
  2. The structure has never suffered from subsidence, heave or any other incidents which affected or compromised the structure and/or value of the property.
  3. There are no trees or other vegetation on or in the vicinity of the structure that could cause root damage either directly or indirectly.
  4. The structure is not listed, or else if it is listed you have taken this into account when indicating the reinstatement cost, as the reinstatement cost of listed buildings may be higher than normal (we would advise that you obtain professional advice regarding the reinstatement cost of any listed building).
Please confirm that you agree to the above statements.
If you disagree, please provide details:

Structure 2

Name or description of structure (eg ‘main house’, ‘barn A’, ‘boundary wall’ etc):
Professional reinstatement cost of new works only:
Total external floor area (including upper floors, basements & habitable roof space):
metres
New or existing structure?
Professional reinstatement cost of the retained structure (not including new works):
If Other, please provide details:
If Other, please provide details:
If Other, please provide details:

The following assumptions have been made regarding this structure:

  1. You will not need to carry out any form of underpinning, foundation reinforcement or stabilisation work to the structure.
  2. The structure has never suffered from subsidence, heave or any other incidents which affected or compromised the structure and/or value of the property.
  3. There are no trees or other vegetation on or in the vicinity of the structure that could cause root damage either directly or indirectly.
  4. The structure is not listed, or else if it is listed you have taken this into account when indicating the reinstatement cost, as the reinstatement cost of listed buildings may be higher than normal (we would advise that you obtain professional advice regarding the reinstatement cost of any listed building).
Please confirm that you agree to the above statements.
If you disagree, please provide details:

Structure 3

Name or description of structure (eg ‘main house’, ‘barn A’, ‘boundary wall’ etc):
Professional reinstatement cost of new works only:
Total external floor area (including upper floors, basements & habitable roof space):
metres
New or existing structure?
Professional reinstatement cost of the retained structure (not including new works):
If Other, please provide details:
If Other, please provide details:
If Other, please provide details:

The following assumptions have been made regarding this structure:

  1. You will not need to carry out any form of underpinning, foundation reinforcement or stabilisation work to the structure.
  2. The structure has never suffered from subsidence, heave or any other incidents which affected or compromised the structure and/or value of the property.
  3. There are no trees or other vegetation on or in the vicinity of the structure that could cause root damage either directly or indirectly.
  4. The structure is not listed, or else if it is listed you have taken this into account when indicating the reinstatement cost, as the reinstatement cost of listed buildings may be higher than normal (we would advise that you obtain professional advice regarding the reinstatement cost of any listed building).
Please confirm that you agree to the above statements.
If you disagree, please provide details:

Structure 4

Name or description of structure (eg ‘main house’, ‘barn A’, ‘boundary wall’ etc):
Professional reinstatement cost of new works only:
Total external floor area (including upper floors, basements & habitable roof space):
metres
New or existing structure?
Professional reinstatement cost of the retained structure (not including new works):
If Other, please provide details:
If Other, please provide details.
If Other, please provide details.

The following assumptions have been made regarding this structure:

  1. You will not need to carry out any form of underpinning, foundation reinforcement or stabilisation work to the structure.
  2. The structure has never suffered from subsidence, heave or any other incidents which affected or compromised the structure and/or value of the property.
  3. There are no trees or other vegetation on or in the vicinity of the structure that could cause root damage either directly or indirectly.
  4. The structure is not listed, or else if it is listed you have taken this into account when indicating the reinstatement cost, as the reinstatement cost of listed buildings may be higher than normal (we would advise that you obtain professional advice regarding the reinstatement cost of any listed building).
Please confirm that you agree to the above statements.
If you disagree, please provide details:

Structure 5

Name or description of structure (eg ‘main house’, ‘barn A’, ‘boundary wall’ etc):
Professional reinstatement cost of new works only:
Total external floor area (including upper floors, basements & habitable roof space):
metres
New or existing structure?
Professional reinstatement cost of the retained structure (not including new works):
If Other, please provide details:
If Other, please provide details.
If Other, please provide details:

The following assumptions have been made regarding this structure:

  1. You will not need to carry out any form of underpinning, foundation reinforcement or stabilisation work to the structure.
  2. The structure has never suffered from subsidence, heave or any other incidents which affected or compromised the structure and/or value of the property.
  3. There are no trees or other vegetation on or in the vicinity of the structure that could cause root damage either directly or indirectly.
  4. The structure is not listed, or else if it is listed you have taken this into account when indicating the reinstatement cost, as the reinstatement cost of listed buildings may be higher than normal (we would advise that you obtain professional advice regarding the reinstatement cost of any listed building).
Please confirm that you agree to the above statements.
If you disagree, please provide details:

Legal Expenses and Contracts

As a standard part of your Site Insurance cover we provide a Legal Expenses policy, which may assist you if you wish to take legal action against a contractor or other professional involved in your project. However the Legal Expenses team can only take over a claim where a written contract is in place with the professional concerned. We can offer a package of standard contract templates which you can use to create written contracts with the people involved with your build. The cost of the package is €49.

Should you choose to take advantage of this offer, the cost of the Legal Expenses cover will be reduced from €105 to €73.50.

Do you wish to purchase the contracts package?

Client Details

Introducing broker:
Sub broker code - hidden
Proposer name:
Proposer date of birth:
Proposer address:
Contact telephone number:
Alternative contact telephone number:
Contact Email:


Please enter name of first additional insured person
First additional insured person date of birth:
Please enter name of second additional insured person
Second additional insured person date of birth:
Please enter name of third additional insured person
Third additional insured person date of birth:
Please enter name of fourth additional insured person
Fourth additional insured person date of birth:
Have you set up a company for this project?
Company name & registration number:

Project Finance

Please advise if the project is being funded by a mortgage lender.
The lender's interest may need to be noted on the policy.
Lender name:
Your mortgage reference:

Optional Covers

Please select the level of cover required below

Declaration

THE FOLLOWING ASSUMPTIONS HAVE BEEN MADE. If you disagree with any of these please advise which ones you disagree with and give details in the box below:

In respect of You or any other Insured Person:-

  1. You have never been refused building related insurance nor had any additional or special terms imposed by an insurer.
  2. You have never been convicted of any criminal offence (other than motoring convictions) and have no prosecutions pending.
  3. You have never been prosecuted or received notice of intended prosecution under the Safety, Health and Welfare at Work (Construction) Regulations 2013.
  4. You have never been subject to insolvency or bankruptcy proceedings or any form of voluntary arrangement.
  5. You have never been a director, partner or principal of a House Builder or Construction Company that has gone into liquidation in the past.
  6. You are using a Professional Team who have appropriate Professional Indemnity Insurance.
  7. During the last five years you have not sustained any losses or had a claim made against you (insured or otherwise) that would have been covered by the type of insurance you are applying for here.
Please provide details of why you disagree with the above declaration

It is understood that you have provided complete and accurate information to Insurers and that you have complied with your legal duty to disclose, before inception of the insurance contract, all material matters relating to the risk (ie all information which would influence the judgement of a prudent Insurer in determining whether to underwrite the risk and if so, upon what terms and at what premium).

You understand that if you purchase the policy, the statements made in this proposal shall form the basis of the contract between you and the Underwriter.

Hidden Information

Year of account:
If not 30 days, how many days will the quotation be valid for?
Only enter a value in this field if the quotation valid days are different from the standard 30 days for this product, otherwise please leave this field blank
Sanctions Check First Name:
Sanctions Check Surname:
Sanctions Check Additional Insured Firstname 1:
Sanctions Check Additional Insured Surname 2:
Sanctions Check Additional Insured First name 2:
Sanctions Check Additional Insured Surname 2:
Sanctions Check Additional Insured First name 3:
Sanctions Check Additional Insured Surname 3:
Sanctions Check Additional Insured First name 4:
Sanctions Check Additional Insured Surname 4:
Catlin Binder Reference
UKGI Master Policy Number
US Sanctions

Calculation Page

Total PRC
Total PRC Existing Actual
Total PRC Existing Structures
Total PRC New Structures
EL Premium
Adjustment Charge EL
PL Premium
Adjustment Charge PL
CAR Premium
Adjustment Charge CAR
PABB Premium
Legal Expenses Premium
Adjustment Charge LE
Contractstore Premium
Adjustment Charge Contractstore
Policy Period - number of days
Hired Plant Discount/Loading
Own Plant Discount/Loading
Caravans Limit Discount/Loading
Contents Caravans Limit Discount/Loading
PL Limit Discount
Excess Discount
Total Discount
Total Floor Area
Adjustment Charge Existing